Unpacking The Hms 400 Server; Removing The Side Cover - Nortel HMS400 Installation And Configuration Manual

Hospitality messaging server
Hide thumbs Also See for HMS400:
Table of Contents

Advertisement

Unpacking the HMS 400 server

Introduction
Follow this procedure to unpack the server and peripherals.
To unpack the equipment
ATTENTION
1. Carefully open the cardboard carton containing the server.
2. Remove the server from the carton and set it on the floor.
3. Carefully open the cartons containing the monitor, keyboard, mouse, modem, and set the
peripherals aside.
4. Put all manuals, CD-ROMs, operating system disk, any disk for peripherals, and the
Windows emergency repair disk in a safe place.
5. Save all packing materials and cartons in case you must return any equipment to the
carrier.

Removing the side cover

Introduction
This section describes how to remove the server's side cover so that you can work with the interior
components. The side cover is on the server's left side when the front of the server is facing you.
To remove the side panel
Nortel Hospitality Messaging Server 400
Installation and Configuration Guide
WARNING
Risk of personal injury
The HMS 400 server weighs approximately 20 kg as
shipped from manufacturing. If necessary, and to
prevent personal injury, ask someone to help you
unpack and position the server
As you unpack each item, check it off against the
packing list.
WARNING
Risk of personal injury
Be careful when you handle the sharp edges of the side
panel and chassis to prevent personal injury.
.
April 2006
-49-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents