Communication Server 1000 task flow
Communication Server 1000M and Meridian 1
Preparing and planning for the upgrade
This section provides a high-level task flow for the installation or upgrade of
a CS 1000 system. The task flow indicates the recommended sequence of
events to follow when configuring a system and provides the NTP number
that contains the detailed procedures required for the task.
For more information refer to the following NTPs, which are referenced in
Figure 1 on
page
28:
•
Linux Platform Base and Applications Installation and Commissioning
(NN43001-315)
•
Communication Server 1000M and Meridian 1 Large System
Installation and Commissioning (NN43021-310)
•
Communication Server 1000M and Meridian 1 Large System Upgrades
Overview (NN43021-458)
61C CP PII to CS 1000M MG CP PIV FNF
Page 27 of 196