Download Print this page

Before Starting The Work - Canon LASER CLASS 810 Service Manual

Hide thumbs Also See for LASER CLASS 810:

Advertisement

2.1.2 Before Starting the Work

Be sure to go through the following before starting the work:
1) If you are installing the machine after moving it from a cold to warm location, be sure to leave the machine unpacked for at least 2 hours so that the machine is
fully used to the site temperature, thus avoiding image faults caused by condensation. (The term "condensation" refers to the formation of droplets of water on
the surface of a metal object brought in from a cold to warm place, i.e., as the result of the rapid cooling of the moisture (vapor) around the object.)
2) The machine weighs a maximum of about 25.5 kg. Be sure to work in a group of 2 persons when lifting it.
Chapter 2
0016-7377
2-3

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Laser class 830i