CPI BNA6 ADVANCE User Manual page 28

Note validator & note recycler
Table of Contents

Advertisement

Operate
Reinstall the lower recycling cassette B prior to reinstalling the upper recycling cassette A:
1
If removed, reinstall the lower recycling cassette [A]. If not removed, reinstall the upper recycling cassette [B].
2
Insert the key [1] in the lock [C].
3
Use your left hand best to push the key and turn it counter-clockwise as far as it will go [D].
4
Remove the key from the lock [D].
The lower recycling module is relocked.
5
Repeat steps 1 to 4 to reinstall the upper recycling cassette.
6
Lower/reinsert locking pin [2] in the back of the chassis [E].
7
Reinstall loading module (see chapter 4.3.4 "Removing, opening, and reinstalling optional loading module (note recycler only)", p. 24)
and relock interlock system (see chapter 4.3.1 "Unlocking and relocking interlock system", p. 20).
8
Reset note recycler.
Fig. 50: Reinstalling recycling modules in this order
28
BNA6 Advance & BNR Advance Note Validator and Note Recycler
Published by CPI
Fig. 51: Locking recycling modules
01_CPI_BNA6 Advance Note Validator-BNR Advance Note Recycler_User Guide_V2.0_EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bnr advanceBnr6 advanceBna6 advance mBna6 advance lBnr4-21 advanceBna4-10 advance ... Show all

Table of Contents