Inverter Installation; Moving The Inverter; Installing The Inverter - Goodwe DNS Series User Manual

Grid-tied pv inverter 2.9-6kw
Hide thumbs Also See for DNS Series:
Table of Contents

Advertisement

05 Installation

5.2 Inverter Installation

5.2.1 Moving the Inverter

Move the inverter to the site before installation. Follow the instructions below to avoid
personal injury or equipment damage.
1. Consider the weight of the equipment before moving it. Assign enough personnel to move
the equipment to avoid personal injury.
2. Wear safety gloves to avoid personal injury.
3. Keep balance to avoid falling down when moving the equipment.

5.2.2 Installing the Inverter

• Avoid the water pipes and cables buried in the wall when drilling holes.
• Wear goggles and a dust mask to prevent the dust from being inhaled or contacting eyes
when drilling holes.
• The DC switch lock is prepared by the customer.
Step 1 Put the mounting plate on the wall or the support horizontally and mark positions for
drilling holes.
Step 2 Drill holes to a depth of 80mm using the hammer drill. The diameter of the drill bit
should be 10mm.
Step 3 Secure the mounting plate using the expansion bolts.
Step 4 (Only for Australia.) Install the DC switch lock.
Step 5-6 Install the inverter on the mounting plate.
Step 7 Install the anti-theft lock.
CAUTION
NOTICE
14
User Manual V1.0-2022-12-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents