Download Print this page

Luna BTS 315 User Manual page 52

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 46
• Install Blade guard A to Riving knife C with part 1
and 2.
• Install Hose support rod B to right extension table
with part 3, 4, 5 and 6.
A
2
1
C
Fig. 4.4.2
4.4.3 Install square sliding table
• Put the square sliding table C into the slot of sliding
table A.(Deputy C/F not recommended installation)
• Put the support rod D into the hole of square sliding
table C and the hole on support arm E.
• Lock the handle B.
Fig. 4.4.3
4.4.4 Install telescopic fence
• Put the pin A of telescopic fence into the hole which
is on the square sliding table, and mount the handle
B to the pin.
• Lock the knob C for stable tighting.
• The Knob D is designed to micro-adjust perpendi-
cularity between telescopic fence and blade.
B
3
4
5
6
B
C
D
A
F
E
D
C
Fig. 4.4.4 (1)
4.4.5 Install fence rail
Tools Required for Assembly:
• Wrench 18mm
• L Wrench 16mm
• Install scale seat B to tables with screw 1.
• Put the scale A into the slot of scale seat B.
• Install shaft 6 onto the guide rail C, and then mount
the guide rail to tables with part 2, 3, 4, 5 and 6.
1
4.4.6 Install rip fence
• Install the rip fence seat A to guide rail B as the pic-
ture shown.
• Install the screw C onto the guide rail B.
• Install the rip fence D to the fence seat A along its slot.
D
51
A
B
Fig. 4.4.4 (2)
A
B
2
3
4 5
Fig. 4.4.5
A
C
B
Fig. 4.4.6
A
B
C
C
6

Advertisement

Chapters

loading

This manual is also suitable for:

23674-0106