iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
Figure 8-11 Installing monitoring communications cables
----End
8.2 Grid Scenario
8.2.1 Installing Ground Cables
Precautions
Ensure that the ground cable is securely connected. Otherwise, electric shocks may
occur.
Procedure
Step 1 Install ground cables.
Issue 01 (2022-07-15)
D ANGER
Copyright © Huawei Technologies Co., Ltd.
8 Electrical Connection
83