iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
Figure 5-16 Rotating the L-shaped sheets on the top cover
Step 2 Install the top cover on the battery module.
Figure 5-17 Installing the top cover
----End
5.5 (Optional) Installing an AC Parallel Box
Prerequisites
In a parallel system, an AC parallel box must be configured.
Step 1 Mark mounting holes.
Issue 01 (2022-07-15)
Copyright © Huawei Technologies Co., Ltd.
5 System Installation
57