iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
Figure 8-57 Installing battery signal cables
----End
8.5.3 Installing PV Input Power Cables
Procedure
Step 1 Use a removal wrench to remove the waterproof gland from the PV input terminal
on the power module.
Take out the removal wrench from the decorative cover delivered with the product.
Step 2 Install the PV input power cables.
Issue 01 (2022-07-15)
NO TE
Copyright © Huawei Technologies Co., Ltd.
8 Electrical Connection
128