Step 3 Installing battery signal cables.
1.
2.
3.
4.
5.
6.
Step 4 Install communications cables for other battery modules in sequence.
Issue 01 (2022-07-15)
Figure 8-42 Installing battery module power cables
Remove the waterproof gland from the communications terminal of a battery
module.
Remove the locking cap and waterproof rubber plug from the
communications terminal housing.
Install communications cables for the battery module.
Lock the communications terminal waterproof gland.
Reinstall the waterproof rubber plug.
Tighten the locking cap and secure the signal cables using cable clips.