2.1 Overview

2.2 Appearance
2.3 System Networking
2.4 Label Description
2.1 Overview
Function
The iSitePower-M system consists of power modules and battery modules. It can
store and release electricity based on the status of PV modules, mains, and diesel
generators (DGs).
In the PV+mains+DG scenario, two working modes are supported:
DOD:depth of discharge, which is the battery end-of-discharge capacity.
Issue 01 (2022-07-15)
NO TE
Inverter Priority Mode
The energy of PV modules and batteries is preferentially used for inverter
output. When the battery power is insufficient, there is no sunlight or the
sunlight is weak, and the mains or DG is available, the UPS quickly switches
to bypass mode. If an insulation fault occurs on the PV side, the PV relay is
disconnected and the PV side shuts down. The inverter can still work or the
system transfers to bypass mode. If the insulation fault occurs not only on the
PV side, disconnect all relays and shut down the inverter. In inverter mode, PV
modules can be used to charge batteries.
Copyright © Huawei Technologies Co., Ltd.
2

Product Description

2 Product Description
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents