8.9 Verifying the Installation

8.9.1 Verifying the Installation
Table 8-1 Check items and acceptance criteria
No.
1
2
3
Issue 01 (2022-07-15)
Check Item
Product installation
Cables routing
Cable bonding
Copyright © Huawei Technologies Co., Ltd.
8 Electrical Connection
Expected Result
The installation is correct and reliable.
Cables are routed properly as required
by the customer.
Cable ties are evenly distributed and no
burr exists.