Huawei iSitePower-M V100R002C00 User Manual page 32

Hide thumbs Also See for iSitePower-M V100R002C00:
Table of Contents

Advertisement

iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
Figure 2-8 System configurations
● Maximum capacity:
● In a parallel system, three routes of single-phase output can be combined but they
● In parallel connection scenarios, the number of battery modules on the master and
Table 2-4 Recommended battery configuration
Scenario
Single-node
system
Issue 01 (2022-07-15)
NO TE
1. In a single-node system, a maximum of six battery modules can be connected.
2. In a parallel system, a maximum of three power modules can be connected. Each
power module can connect to a maximum of three battery modules.
cannot be used as three-phase output.
slave products must be the same.
Number of
Power Modules
1
Copyright © Huawei Technologies Co., Ltd.
2 Product Description
Number of
System Capacity
Battery Modules
1
3kVA/5kW
2
6kVA/10kW
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents