iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
NO TICE
● A surge protection device must be configured for the upstream AC input of the
system. You need to configure and install the device by yourself.
● The upstream AC input of the system must be configured with an AC circuit
breaker with a capacity of 40 A. The circuit breaker needs to be configured by
the customer. The D-type tripping circuit breaker cannot be used because it
cannot effectively protect the product.
● No leakage protection device is required for the upstream AC input. If a
leakage protection device is configured, it is recommended that the leakage
current be greater than or equal to 100 mA x
power modules.
In a single-node system, connect the other end of the AC input power cable to an AC PDC.
In a parallel system, connect the other end of the AC input power cable to the AC parallel
box.
Procedure
Step 1 Connect AC power cables to the terminal connectors.
Figure 8-47 Connecting cables to terminals
Step 2 Install the AC input power cable and secure the cable using cable clips.
Issue 01 (2022-07-15)
NO TE
Copyright © Huawei Technologies Co., Ltd.
8 Electrical Connection
n , where n is the number of
117

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents