Huawei iSitePower-M V100R002C00 User Manual page 62

Hide thumbs Also See for iSitePower-M V100R002C00:
Table of Contents

Advertisement

iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
iSitePower-M V100R002C00 User Manual
(MAP05A1, MAB05B1)
Figure 5-8 Standard mounting holes
Step 2 Drill holes and install expansion bolts.
When drilling holes, avoid the water pipes and power cables buried in the wall.
● Use the M12x60 expansion bolts delivered with the product to secure the wall-mounting
● Use the M6x60 expansion bolts delivered with the product to secure the modules. If the
Figure 5-9 Installing expansion bolts
Issue 01 (2022-07-15)
D ANGER
NO TE
bracket. If the length or quantity of the expansion bolts cannot meet the installation
requirements, prepare M12 stainless steel expansion bolts by yourself.
length or quantity of the expansion bolts cannot meet the installation requirements,
prepare M6 stainless steel expansion bolts by yourself.
Copyright © Huawei Technologies Co., Ltd.
5 System Installation
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents