Figure 8-79 Install the grid detection cable of the ATS
----End

8.6.8 Installing Cables in a Parallel System

8.6.8.1 Installing a Ground Cable for the Parallel Box

Procedure
Step 1 Install a ground cable.
Figure 8-80 Installing a ground cable
----End