Installation |
Chapter 4
Install the Shelves
The shelves may be installed at any level in the environmental chamber.Install a shelf
channel on each side. With the tabs pointing up, attach the channel by locating the rivet
into a slotted hole, far end first. Pull the channel toward the front and slide the front rivet
on the channel into the slotted hole and press down. Make sure that the channels are
opposite each other so that the installed shelf will be level.
Figure 4-1
Shelf Channel on Side Duct
Level the Unit
Place a bubble-type level on a shelf inside the environmental chamber. Adjust the feet as
needed; counterclockwise to lengthen or clockwise to shorten. Level the unit
front-to-back and left-to-right.
Thermo Scientific
Model 3962 | 4-3