Miele PDR 914 Operating And Installation Instructions page 33

Commercial tumble dryer
Table of Contents

Advertisement

The floor load created by the tumble dryer is concentrated and
transferred to the installation surface via the adjustable feet. A base
is not required. However, an uneven floor surface must be
compensated for.
PDR 514/518/522/914/918/922
x
1,400 mm
y
906 mm
z
PDR 514/914: 852 mm
PDR 518/918: 1,035 mm
PDR 522/922: 1,164 mm
To facilitate any future maintenance work, a maintenance corridor
with a width of at least 500 mm must be set up behind the machine
and must be accessible at all times. The distance between the
machine and any walls must not fall below the specified minimum
values.
Adjust the tumble dryer feet until the machine is level. Use a spirit
level to ensure correct alignment.
Installation
PDR 528/544/928/944
1,640 mm
1,206 mm
PDR 528/928: 1,018 mm
PDR 544/944: 1,384 mm
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 918Pdr 922Pdr 928Pdr 944

Table of Contents