Selecting Programme Packages; Completing The Initial Commissioning Process - Miele PDR 914 Operating And Installation Instructions

Commercial tumble dryer
Hide thumbs Also See for PDR 914:
Table of Contents

Advertisement

Using for the first time
Skipping payment
system set-up
20

Selecting programme packages

You can select various programmes from the programme packages.
Any programmes already active are highlighted in orange.
Programme packages
Label
Standard
Cottons
Cottons
Cottons PRO
Minimum iron
Swipe to the left with your finger until you reach a programme that
is not highlighted in orange.
Touch the programme to be activated.
The selected programme is now active and highlighted in orange.
You can select further programmes if required.
If you do not want to select any more programmes, confirm with the
OK
sensor.
The display will change to the next setting.
Useful tip: You can disable a selected programme by touching the
programme again. Exception: The
programmes cannot be disabled.
Setting up a payment system
If you wish to set up a payment system, see "Supervisor level -
Payment system". These settings can only be changed during the
initial commissioning process. If you wish to change the settings later,
please contact Miele.
If you do not wish to set up a payment system, you can skip this step.
Payment system
No payment
Timed
system
operation
Programme
Timed op. +
control
impul.counter
No payment system
Touch the
OK
Touch
to confirm.
The display will change to the next setting.

Completing the initial commissioning process

The commissioning process is complete when a programme lasting
longer than 10 minutes has been carried out in full.
11:02
Woollens
Delicates
OK
Cottons
11:02
COM module
OK
 sensor.
Cottons PRO
and

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 918Pdr 922Pdr 928Pdr 944

Table of Contents