6 Commissioning
Please check the country supported by this product at
power.com/.
Set Country/Region to the country/region where the inverter is installed. Oth-
erwise, the inverter may report a fault.
step 10 After a plant is successfully created, return to the App home page to view the plant
information.
- - End
6.5

Initializing the Device

The inverter is successfully connected to the router.
If there is no latest equipment upgrade package, skip steps 1 and 2.
The actual initializing procedure may differ due to different countries. Please follow the ac-
tual App guidance.
step 1 If a latest equipment upgrade package is available, the following prompt window pops up.
Tap UPDATE NOW to download the latest update package.
step 2 After download, it would take around 15 minutes to update. After successful upgrade, the
screen will show the version numbers before and after the upgrade as well as the upgrade
time. Tap NEXT.
58
figure 6-3 Upgrade Reminder
User Manual
http:// support.sungrow-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg8.0rsSg9.0rsSg10rs

Table of Contents