Ac Cable Connection; Ac Side Requirements - Sungrow SG5.0RS-ADA User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG5.0RS-ADA:
Table of Contents

Advertisement

User Manual
5.5

AC Cable Connection

5.5.1 AC Side Requirements

Only with the permission of the local grid department, the inverter can be con-
nected to the grid.
Before connecting the inverter to the grid, ensure the grid voltage and frequency comply with
requirements, for which, refer to "Technical Date". Otherwise, contact the electric power
company for help.
AC Circuit Breaker
An independent two-pole circuit breaker must be installed on the output side of the inverter
to ensure safe disconnection from the grid. The recommended specifications are as follows.
Inverter Model
SG5.0RS-ADA
SG8.0RS/SG9.0RS
SG10RS
Testing to AS/NNZS 4777.2:2020 Section for multiple phase combinations has not
been conducted.
AC circuit breakers should be installed on the output side of the inverter and the
grid side to ensure safe disconnection from the grid.
Determine whether an AC circuit breaker with greater overcurrent capacity is re-
quired based on actual conditions.
Do not connect any local load between the inverter and the AC circuit breaker.
Multiple inverters cannot share one AC circuit breaker.
Residual Current Monitoring Device
With an integrated universal current-sensitive residual current monitoring unit included, the
inverter will disconnect immediately from the mains power once a fault current with a value
exceeding the limit is detected.
However if an external residual current device (RCD) (type A is recommended) is mandatory,
the switch must be triggered at a residual current of 300 mA (recommended). RCD of other
specifications can also be used according to local standard.
Recommended Specification
32 A
50A
63 A
5 Electrical Connection