Maintenance Safety - Sungrow SG5.0RS-ADA User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG5.0RS-ADA:
Table of Contents

Advertisement

User Manual
1.5

Maintenance Safety

Risk of inverter damage or personal injury due to incorrect service!
Before maintenance, disconnect the AC circuit breaker on the grid side and
then the DC switch. If a fault that may cause personal injury or device damage
is found before maintenance, disconnect the AC circuit breaker and wait until
the night before operating the DC switch. Otherwise, a fire inside the product or
an explosion may occur, causing personal injuries.
After the inverter is powered off for 10 minutes, measure the voltage and cur-
rent with professional instrument. Only when there is no voltage nor current
can operators who wear protective equipment operate and maintain the inverter.
Even if the inverter is shut down, it may still be hot and cause burns. Wear pro-
tective gloves before operating the inverter after it cools down.
Touching the power grid or the contact points and terminals on the inverter con-
nected to the power grid may lead to electric shock!
The power grid side may generate voltage. Always use a standard voltmeter to
ensure that there is no voltage before touching.
To prevent misuse or accidents caused by unrelated personnel, post prominent
warning signs or demarcate safety warning areas around the product.
To avoid the risk of electric shock, do not perform any other maintenance opera-
tions beyond those described in this manual. If necessary, contact your distributor
first. If the problem persists, contact SUNGROW. Otherwise, the losses caused is
not covered by the warranty.
1 Safety Instructions
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg8.0rsSg9.0rsSg10rs

Table of Contents