Moving The Inverter - Sungrow SG5.0RS-ADA User Manual

1-phase pv grid-connected inverter
Hide thumbs Also See for SG5.0RS-ADA:
Table of Contents

Advertisement

User Manual
MC4 terminal
crimping tool (4
mm
2
–6 mm
Phillips screwdriver
(M4)
Heat gun
Rubber mallet
4.4

Moving the Inverter

Before installation, remove the inverter from the packing case and move it to the installation
site. Follow the instructions below as you move the inverter:
Always be aware of the weight of the inverter.
Lift the inverter using the handles positioned on both sides of the inverter.
Move the inverter by one or two people or by using a proper transport tool.
Do not release the equipment unless it has been firmly secured.
Tube terminal
crimping tool (0.5
mm
2
–1.0 mm
2
)
Vacuum cleaner
Wrench (33 mm, 35
mm)
Hammer drill (φ10)
Electric screwdriver
(M4, M5, M6)
2
)
Measuring tape
MC4 terminal
wrench
Allen wrench (T27)
4 Mechanical Mounting
Slotted screwdriver
(M2)
Heat shrink tubing
Multimeter (≥ 600
Vdc)
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg8.0rsSg9.0rsSg10rs

Table of Contents