40
About this document
241-1501-240 5.2S2
•
clarified that the procedure "Installing extended cable management
brackets" (page 601) applies only to electrical FPs with coax cables
•
added the procedure "Installing high-density cable management
brackets" (page 619)
•
in the procedure "Removing front or rear frame panels" (page 774),
replaced the figure "Location of front, rear, and side panels, exploded
view" with "Locations of front and rear frame panels, exploded view"
(page 775)
•
added the procedure "Removing a shelf filler panel" (page 721)
•
added the procedure "Removing a side frame panel, regular or extended
sizes" (page 724) in context of accessing cables on the side of a NEBS
2000 frame, or to replace a damaged one, and added the figure "Side
panels, exploded view" (page 726)
•
added dust boots to the procedure "Removing an FP" (page 750) and
added the figure "Fully opened card latches" (page 754)
•
deleted the step to power down a cooling unit in the procedure
"Replacing a cooling unit alarm cable" (page 787)
•
updated the Prerequisites of the procedure "Routing FP cables"
(page 827) to clarify the cable management criteria for the direction of
electrical and optical cables
•
revised the procedure "Routing FP cables" (page 827) to accommodate
— fiber optical Y-splitter cables
— labels
— all cables of an FP
— all FPs in a shelf
•
added clones of figures to most procedures that had cross-references to
figures in other procedures
•
in the procedure "Testing the power to the BIP" (page 860), made
corrections to resistance values, corrected ohmmeter to voltmeter for
when the user is asked to measure potential difference, and asked the user
to turn the power off before beginning the procedure