5 Installation Procedure
A - Drive grounding terminal (FE)
B - Included screw
5.
Install the option (A) into the CN5-A connector (C) on the drive and use one of the
included screws (B) to put it in place.
Tighten the screw to a correct tightening torque:
• 0.5 N∙m to 0.6 N∙m (4.4 lbf∙in to 5.3 lbf∙in)
Note:
1. Only two screws are necessary to install the option on an FP605 drive.
2. The option package contains three screws and one ground wire.
32
Figure 5.18 Connect the Ground Wire
C - Ground wire
D - Stud
YASKAWA TOEP C730600 85A CANopen Installation Manual