Assembly Replacement
Procedure 16. A21 OCXO (Non-Option 103)
Figure 3-35
A21 OCXO Mounting Screws
Replacement
1. Connect W49, coax 82, to the OCXO and position the OCXO and
2. Secure the OCXO to the spectrum analyzer main deck using three
3. Fold the A14 and A15 assemblies into the spectrum analyzer as
4. Perform the rear frame assembly replacement procedure described
222
insulator in the spectrum analyzer. Dress W50 (orange cable) next to
W49 through the opening in the deck.
screws (1) and three shoulder washers. See
described in procedure 9.
in procedure 13.
Figure 3-35 on page
Chapter 3
222.