S Loading Unit Replacement - Panasonic DVCPRO HD EX AJ-HD1200AP Service Manual

Hide thumbs Also See for DVCPRO HD EX AJ-HD1200AP:
Table of Contents

Advertisement

2-13. S Loading Unit Replacement

(Removal)
1.
Remove the Cleaner Solenoid unit. (Refer to 2-8)
2.
Remove the Motor Bracket Unit. (Refer to 2-9)
3.
Turn the Cam Relay Gear (B) counterclockwise to
place the unit in the loading complete condition.
(Fig.2-13-1)
4.
Unscrew the 4 screws A and 2 screws B, then the
loading guide. (Fig.2-13-1)
5.
Turn the Cam Relay Gear (B) clockwise to return
the unit in the unloading complete condition.
6.
Remove the Cut Washer C and a washer, and
then the S Loading Unit. (Fig.2-13-2)
(Installation)
1.
Install a new S Loading Unit in the reverse steps
of the removal.
2.
The hole D of the S Loading Unit and the hole E
of the S Sector Gear should be geared each
other.
Fig.2-13-1
MECH-35
Fig.2-13-2
Fig.2-13-3

Advertisement

Table of Contents
loading

Table of Contents