Alpha ESS SMILE5 Installation, Operation & Maintenance Manual page 95

Energy storage system
Table of Contents

Advertisement

Maintenance and Troubleshooting
100058
AFCI_check_protect
100060
Dsp_selfcheck
100122
EEPROM R/W Failure
DSP communication
100123
failure
12V auxiliary power
100145
Fault
1. Restart the system and check whether
the fault persists.
2. If it persists, please contact the customer
service center for further check.
Internal procedures are not compatible,
please contact customer service for repair.
1. If a remote upgrade has been performed
and the inverter can return to normal op-
eration, this is a normal result of the re-
mote upgrade process and no processing
is required;
2. If it continues to appear, please contact
the customer service center for further
check.
1. The communication of the DCDC mod-
ule is lost, contact the customer to up-
grade the DCDC module remotely, and
check whether the inverter is restored after
the upgrade;
2. Try to completely power off the inverter
about 10 minutes, then power on and re-
start to check whether the inverter is re-
stored.
3. If the fault still exists, please contact cus-
tomer service for further check.
1. If it happens occasionally, the inverter
can recover automatically, no processing is
required.
2. If it continues to appear, it can be
judged that the inverter is faulty and
please contact customer service for further
check.
93

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es-alpha-smile 5-10kwh-v2

Table of Contents