Alpha ESS SMILE5 Installation, Operation & Maintenance Manual page 87

Energy storage system
Table of Contents

Advertisement

COMMISSIONING
Step2
Step3
Check the running status of the system in "Step 3".
If the operation is normal as described in "Step3", please remember to deactivate
the "Charging/Discharging Setting" by clicking "OFF" and save the changes.
Select "ON" to Charge Batteries from Grid"
please set the "Charging period 1" for the time and the SOC
would be 100 under this operation.
The relative value should be like this:Load = PV
Battery
Battery should be in
charging
the picture
shows.±
:
>>absorbing from grid: +;
grid:-
If not correct, please check the CT or meter installed direction
of both grid and PV side
GRID –
±
status.PV arrow
should be as
<<
feed-in to
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es-alpha-smile 5-10kwh-v2

Table of Contents