Electrical Installation
NOTE
Connecting the mains supply (input)
NOTE
Scienlab Regenerative AC Emulator – SL1200A Series – Operating Instructions
All essential connection points are located on or in the input and output
terminal box at the rear of the SL1200A Scienlab Regenerative AC Emulator.
Figure 4: Connections of the input and output box
Before commissioning the SL1200A, the following assembly work must be
carried out:
Electrical installation,
DUT connection,
Connecting signal lines and control lines.
All cables must be selected according to the maximum current and country-specific
standards.
The description of connecting the mains supply is based on the standard
version with terminals. Establish the connection in accordance with the
pertinent standards and guidelines at the installation location and according
to the circuit diagram. Install supply lines and interfaces in the control
cabinet.
Prevent tripping hazards due to loosely installed cables.
Protect cable against damage.
The lines to the mains supply are routed via a terminal box (right-hand side)
on the rear of the SL1200A. A right-turning rotating field must be ensured for
the order L1, L2, L3. Further electrical details are listed in the
To ensure that EMC limit values are adhered to, it is important that the shielding of
the EMC cable feedthrough fully surrounds the shielding of the cable.
Connection and Assembly
Technical
3
Data.
29/51