Upkeep And Inspection; General Instructions For Upkeep - Keysight SL1200A Series Operating Instructions Manual

Scienlab regenerative ac emulator
Hide thumbs Also See for SL1200A Series:
Table of Contents

Advertisement

7

Upkeep and Inspection

NOTICE

General Instructions for Upkeep

DANGER
DANGER
DANGER
11
cf. DIN EN 13306, IEC 60050
Scienlab Regenerative AC Emulator – SL1200A Series – Operating Instructions
Upkeep and inspection of the system may only be carried out by specially trained
personnel. (see
Qualification of the
The SL1200A Scienlab Regenerative AC Emulator is largely maintenance free.
A proper upkeep helps to ensure trouble-free and safe operation of the
system. It consists of preventive maintenance and, if necessary, corrective
maintenance
.
11
Unless otherwise agreed, preventive maintenance is carried out by the
operator of the system. It includes regular visual and functional inspections.
The steps involved are described below.
If defects are detected during the inspection that require repair, this is carried
out as corrective maintenance by the manufacturer. For this purpose, please
contact KeysightCare:
Contact KeysightCare
Keysight Technologies Technical Support
Danger to life due to external voltage at the input.
Some components continue to be supplied with voltage after the system is switched
off (indicated by orange wiring color).
Before installation and upkeep work, disconnect the system from all external
voltage sources (e.g. via the laboratory´s sub-distribution board) and secure the
system against being unintentionally switched back on.
Danger to life due to missing protective covers!
Missing protective covers may result in serious injury, burns, or death from electric
shock in case of misuse.
Do not remove protective covers under load or without switching off the system
first.
Replace the protective covers following the assembly and upkeep work.
Residual voltage after switch-off.
In case of connected DUT, the output terminals can still carry voltages even after
switch-off of the system!
Measure the voltage at the outputs to ensure that they are voltage-free.
Upkeep and Inspection
Personnel)
www.keysight.com/find/keysightcare-contact
7
47/51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl1201aSl1202aSl1203aSl1212aSl1213a

Table of Contents