4
Commissioning
Recommissioning
42/51
5 Download the control software SL1200A Regenerative AC Emulator Soft
Front Panel (SFP) and activate the software.
Provided the ambient conditions are right, the SL1200A is operational
✓
after a start-up period of 2 minutes.
After prolonged storage, the same steps as performed for initial
commissioning are required, see Section
Scienlab Regenerative AC Emulator – SL1200A Series – Operating Instructions
Performing Initial
Commissioning.