Housing Ground/Functional Earth - Keysight SL1200A Series Operating Instructions Manual

Scienlab regenerative ac emulator
Hide thumbs Also See for SL1200A Series:
Table of Contents

Advertisement

3
Connection and Assembly
NOTE

Housing ground/functional earth

30/51
To ensure contact protection and avoid electronic interference, the protective screen
must be refitted, and the terminal box door closed after installation of the lines for
mains supply.
As an additional protective measure, an earth connection has been attached
to the SL1200A to reduce and systematically dissipate
electromagnetic/electrical interference.
Scienlab Regenerative AC Emulator – SL1200A Series – Operating Instructions
EMC shield contact
• Cables are routed underneath the terminal box through the EMC
screw connections into the system
• Ensure full-surface contact of the (stripped) cable shielding with
the EMC contact ring
Mains supply connection LV (SL1201A – SL1203A)
• Connection at the provided terminals according to the circuit
diagram
• Ensure a right-turning rotating field for L1, L2, L3, N
• Separate bolt for PE
• Ring cable lug connections
• Tightening torque: see Installation Guide
• 30 kVA/45 kVA systems: single feedthrough
NOTE
using a shared 5-wire cable
Mains supply connection HV (SL1212A, SL1213A)
• Connection at the provided terminals according to the circuit
diagram
• Ensure a right-turning rotating field for L1, L2, L3, N
• Separate bolt for PE
• Ring cable lug connections
• Tightening torque: see Installation Guide
• 90 kVA systems: five feedthroughs for
NOTE
single wires
Housing ground/functional earth
• On the rear side of the system
• Connection and coupling of housing ground
• Connection for EMC-compliant design

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl1201aSl1202aSl1203aSl1212aSl1213a

Table of Contents