8
Decommissioning
8
Decommissioning
Temporary Decommissioning
NOTICE
Storage Conditions
Dismantling, Final Decommissioning
50/51
1 Switch off system and attached module assemblies, see
switching on/off,
2 Carrying out inspection and cleaning the system, see
Inspection
Work.
After a temporary decommissioning, commissioning must be performed again, see
chapter Commissioning.
The ambient conditions as per the
and medium-term storage (up to 2 years).
1 Switch off system,
2 Disconnect the power supply to the system and roll up supply cables and
fix them securely on the system.
3 Disconnect all further lines (signal and control lines, load and measuring
lines) and roll up the cables.
Disassemble and decommission the system by performing the steps in reverse
order. All system parts must be disposed of professionally.
Scienlab Regenerative AC Emulator – SL1200A Series – Operating Instructions
Carrying out
Technical Data
must be observed for short-
Procedure for