Tape Library Numbering (Front View From Control
Figure Legend
Description
0
Tape library 0
1
Tape library 1
2
Tape library 2
3
Tape library 3
4
Tape library 4
5
Left-hand side
6
Right-hand side
6. Enter 1-5 for number of tape library units installed.
7. Enter Single LUN or Multi LUN for LUN Conf.
8. Repeat Steps 2 through 7 for all tape libraries in the system.
9. From the Multi Unit Config tab, touch the Calibrate all PTM's button.
All PTMs in all of the tape libraries are now calibrated.
PTM Configuration and Calibration 5-9
Table 5-1
Panel)