Compaq StorageWorks ESL9000 Series Installation Manual page 27

Pass-through mechanism
Hide thumbs Also See for StorageWorks ESL9000 Series:
Table of Contents

Advertisement

3-6 Compaq StorageWorks Pass-Through Mechanism Installation Guide
7. Slide the PTM mounting tabs onto the screws previously installed in
Step 4.
8. Install the two screws (P/N 0905057) with washers (P/N 0685023) on
the bottom mounting tabs of the PTM, one in each tape library.
9. Connect the PTM cable to the PTM (see Figure 3-5).
1
Figure 3-5. PTM cable connection

Advertisement

Table of Contents
loading

Table of Contents