3.Remove the reagent bottle, standard solution bottle, water
sample bottle and other items from the instrument.
4.Dry the tray and all liquid leakage. It is recommended that
the wiped paper towel and other wastes shall be put into
the disposal bag for subsequent corresponding disposal.
5.After confirming the leakage source and completing repair,
switch on the power supply again to operate the
instrument. Then, the next step of instrument operation can
be carried out.
Note: After the leak is repaired ensure that the position
where the tip of the liquid leak sensor is located is fully
dry and free of residual liquid. Otherwise, the system
alarm will not be eliminated after the instrument is
restarted.

Long-term Shutdown

In order to prevent the crystallization of residues or sediment
of other heavy dirt in the instrument tubelines, especially in the
electronic rotary valve, which may block the tubelines and
cause the failure when starting the instrument next time,
before long-term shutdown, operate by following the following
steps.
1.After entering the maintenance mode of the instrument,
click the icon "
" >> "Instrument maintenance" >>
"Routine cleaning" in the lower left corner of the main
menu, and then click "Start", then wait for the completion of
the cleaning. Perform the above routine cleaning twice.
2.Insert water sample tubeline, standard solution tubeline,
reagent tubeline and deionized water tubeline into a
deionized water bottle. Click the icon "
maintenance" >> "Pre-load tubeline" in the main menu,
select "All", set the pre-loaded volume to "1.2 ml", then click
"Start" and wait for the completion of the pre-loading of all
tubelines.
3.Take out the water sample tubeline and reagent tubeline
from the deionized water bottle, and the standard solution
tubeline and deionized water tubeline shall be maintained in
the deionized water bottle. Click the icon "
"Instrument maintenance" >> "Pre-load tubeline" in the
main menu, select "All", set the pre-loaded volume to
"1.2 ml", then click "Start" and wait for the completion of
the pre-loading of all tubelines. It can be seen that the
Orion 8010cX Ammonia Analyzer
water sample tubeline and reagent tubeline have been
emptied.
4.Click the icon "
"Instrument diagnosis" >> "Valve" in the main menu, for the
target position of the ten-way rotary valve, enter "2", and
then click "Execute" to switch the ports of the ten-way
rotary valve.
5.Wipe the outer wall of the chemical waste liquid and
cleaning waste liquid tubelines to ensure that no waste
liquid remains on the outer wall.
Note: The above operations of the ammonia nitrogen
instrument are usually carried out in the instrument
maintenance mode. Regarding how to enter the
maintenance mode of the instrument, attend the
relevant instrument maintenance training.
">> "Instrument
" >>
" >> "Instrument maintenance">>
Regular Maintenance |