8. If the right-hand tilt angle is larger, adjust the pitch link
(C) IN (1/2 turn) (E).
9. Repeat steps 5, 6, 7 or 8 until the larger angle is now
to the opposite side.
10. If the difference between the two angle measurements
is now greater than it was before the last adjustment,
reverse the last adjustment.
NOTE: This makes the difference as small as possible.