Patient Information - Otto Bock 17KL19 Instructions For Use Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11
Assembling the kit
1) Place the red washer on the bearing bushing.
2) Guide the joint screw through the bearing bushing.
3) Guide the joint screw with the bearing bushing through the bow and the
washer and attach it to the orthotic joint.
4) Bend the bows.
5) Connect the bows to each other, ensuring that the two orthotic joints are
aligned parallel to one another.
6) Check the locking function and adjust if necessary.
Final assembly of orthosis joint
► Use the 633F7 special lubricant to grease the metal.
► Clean the threads of the screw connections using a degreasing cleaner
and secure them with Loctite 241.
INFORMATION
Delivery of finished orthosis to the patient
Prior to delivery of the orthosis to the patient, the fit, support and all func­
tions must be tested.
Pay attention to the parallel alignment of the orthosis joints.
Check the locking mechanism and instruct the patient in handling the lock
and the product.
INFORMATION
Instruct the patient not to unlock the orthotic knee joints under load.

6 Patient information

Inform the patient:
Verify lock functionality
► Before standing up, check that both locks are engaged. Carry out a
function test.
Inspect the orthosis for damage
► Inspect the orthosis for damage daily, paying special attention to the
locks and bars. Contact the qualified personnel promptly if changes are
noted.
7 Cleaning
Promptly clean the product after contact with water containing salt, chlorine
or soap, or if it gets dirty.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

17kl19-217kl19-317kl19-5

Table of Contents