Download Print this page

Spacerails Level 9 Instruction Booklet page 17

Advertisement

ADDING PENDULUM TO STRUCTURE
AS
Step 1: Attach shaft R at about a 45° angle
above the base with the bottom of the shaft
connecting at arm P-2, AP-5, and AE-6. The
shaft should sit just in front of the back row of
shafts and angle up and to the right.
Step 2: Attach shaft AS at arm A-13. Shaft AS
should angle down and to the left side
of the base.
Step 3: With the pendulum facing the front of
the base insert the post of arm AR-1 into the
R
hole on the back left side of the pendulum.
Step 4: Finish by inserting arm AS-1 into the
hole on the back of the pendulum on
the right side.
ADDING ELEVATOR C
BG
Attach elevator C on the left side to arm BG-1
and arm BG-2. The bottom of elevator C should
be approximately 125 cm above the base and
the center shaft of elevator C should line up
with arm BG when observed from the right side
of the base. Fine tuning will be required
as rails are attached to keep everything
running smoothly.
VERTICAL FUNNEL SUSPENDED SHAFTS
AZ
Step 1: Connect shaft AZ (300 mm) at arms
AV-9 and AW-9. This will give added support
to the stunt and keep the top of these shafts
evenly spaced.
Step 2: Next attach shaft AX at arm AV-5
parallel to the base. Then attach shaft AY at arm
AW-5 parallel to the base.
BC
Step 3: Now the funnel shape will be created
BD
starting at the bottom by attaching shaft BC
from arm BC-3 to shaft AX and shaft BD from
arm BD-3 to shaft AY.
Step 4: For the top of the funnel shape connect
shaft BC to arm AV-7 and shaft BD at arm AW-7.
AY
AX
Target a distance of 15 cm at the bottom of the
funnel and 23.5 cm at the top with the bottom
approximately 14.5 cm from the base.
AV
AW
Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com
Page 17

Advertisement

loading