Page 1
LEVEL 6 PRODUCT AND CONSUMER WARNING CHOKING HAZARD: This product contains small parts and is not intended for children under 3. • This product is intended for users 8 years of age and older. • To avoid choking, keep small parts away from children.
Page 2
Pen or Marker 3 AA Batteries (newer models) or 1 C Battery Rail Clip Rail Coupling Marble Rail Ruler (in centimeters) x150 10 PCS 8 PCS 60,000 mm Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 2...
Page 3
Arm Sheath to the See-Saw Arm. (See page 15) Step 1: Attach one Rail Clip on each of the Rail Splitter posts. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 3...
Step 1: Slide Arm Holder B of each arm on to a shaft and lock in place with Arm Lock. Refer to the next page for orientation and location of each arm. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 4...
Page 5
BACK OF BASE BASE Arm A Arm B See-Saw Arm FRONT OF BASE Shaft A Shaft B 295 310 Shaft C Shaft D 291 303 Shaft E Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 5...
Page 6
SHAFT ASSEMBLY CONTINUED Shaft F Shaft G Shaft H Shaft I Shaft J Shaft K Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 6...
Page 7
SHAFT ASSEMBLY CONTINUED Shaft L 81 92 Shaft M 313 330 342 Shaft N Shaft O 57 69 158 174 191 224 336 Shaft P Shaft Q Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 7...
Page 8
Shaft V and Shaft W are suspended above the base using Arm B connections from shafts Q, R, S, and T. SHAFT TO BASE ORIENTATION BACK OF BASE BASE FRONT OF BASE Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 8...
Step 7: Insert three Elevator Guards each Step 6: Attach Rail Clips in the bottom two Elevator Rings. to each Elevator Ring as shown. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 9...
Page 10
Please see the included full size drawings. This will simplify the positioning of the base, arms, shafts, and the rail cut lengths. 75cm 100cm 341 cm 410 cm 480 cm 495 cm 550 cm Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 10...
Page 11
OF BASE SHAFT TO BASE ORIENTATION NOTE: Shaft V and shaft W are suspended above the base using Arm B connections from shafts Q, R, S, and T. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 11...
Page 12
Rails should extend into the elevator enough to catch the Marble. Keep incline as smooth as possible to avoid losing speed or contact with rails. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 12...
Page 13
6 cm on the back loop. These numbers are intended to be a guide only. Test your loops with the Marble. Adjust until you get good consistent speed throughout this section. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 13...
Page 14
NOTE: If length of rail is longer or shorter than expected try adjusting the size of the nested loops to better utilize the rails. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 14...
Page 15
Attach the arm to the shaft and the shaft to the base prior to attaching the round receiver side of the Arm Sheath to the See-Saw Arm. Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 15...
Page 16
Proceed from Arm R-5 to Arms S-4, T-4, R-4, Q-3, S-3, T-3, R-3, Q-2, N-2, H2, and enter the back facing rail clip on the second Elevator Ring. Repeat entire step for second rail. Splitter C Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 16...
Page 17
L-5 and then create a figure 8 pattern by connecting through M-5, J-3, K-3, L-4, M-4, J-2, L-3, and out to M-3. Continue past the elevator to F-3, C-1, F-2, E-2, D-3, A-2, E-1, F-1 and enter Elevator Ring 2 on the Left side. Repeat step for second rail. Step1: Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 17...
Page 18
Create a dip or find other ways to slow marbles to just the right speed at entrance. Overhead view of cascading loops in step 1 Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 18...
Page 19
NOTES Seaich Corporation, LLC. All rights reserved. www.seaich.com | Spacerails, LLC. www.spacerails.com Page 19...
Need help?
Do you have a question about the LEVEL 6 and is the answer not in the manual?
Questions and answers