6 Assembly
Fig. 2: Dimensioned drawing CDR 12/24 V
6 Assembly
NOTE! Maximum torque: 10 Nm
To assemble the device, perform the following steps:
ü Choose a cool, dry and well-ventilated assembly site.
ü Do not mount the device directly next to or above batteries.
ü Guarantee adequate cooling for an unimpeded supply of cooling air.
1 Fasten the device to the 4 holes on the side (Ø 6 mm).
ð The device is assembled.
8
LEAB Automotive GmbH
LEAB Automotive GmbH
Thorshammer 6
24866 Busdorf