2
Scope of supply of the valve pit
28 of 62
5 Installation at Site
2)
8. Fasten the hose
to the leakage return connection (7) of the collecting tank and
to the leakage return connection (4) of the valve pit with two hose clips
9. Connect the discharge line to the discharge connection (10) of the valve pit with
a flexible high-pressure pipe coupling as per the coupling manufacturer's
product literature.
SRA
2)
.