Installing The Chassis In The Rack - Cisco UBR10012 Quick Start Manual

Cisco systems universal broadband router installation guide
Table of Contents

Advertisement

Installing the Chassis
Figure 10
Flush mount front

Installing the Chassis in the Rack

With the fan assembly, PEMs, PREs, line cards, and uplink cards removed from the chassis, and the
mounting brackets installed, the Cisco uBR10012 chassis is ready for installation in a 19-inch equipment
rack or Telco rack.
Caution
The Cisco uBR10012 chassis with all the components removed still weighs 60 lbs (27.22 kg). Take all
necessary precautions when rack-mounting this chassis. A minimum of two people and a maximum of
three people are required for installing this chassis in a rack.
Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special
precautions to ensure that the system remains stable. The following guidelines are provided to ensure
your safety. Statement 1006
Cisco uBR10012 Series Universal Broadband Router–Quick Start Guide
26
Installing the Mounting Brackets—Flush Mount Front and Offset Mount Front
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with
the heaviest component at the bottom of the rack.
If the rack has stabilizing devices, install the stabilizers before mounting or servicing the unit
in the rack.
Offset mount front
OL-24972-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ubr10012 series

Table of Contents

Save PDF