PCB mounting: connecting a cable variant ATOM readhead
Shielding
For optimum performance:
•
Ensure 100% shielding
•
Ground the mounting brackets
•
Use a metal clamp around the cable ferrule to ground the readhead cable
•
Ensure continuity of all shields
•
Maximise the distance between the encoder and motor cables
•
Provide appropriate strain relief at the readhead and interface
•
The ACi should be contained within a shielded enclosure
•
Ensure suitable clamping to retain interboard connector to the mating connector
Approved ESD precautions must be followed at all times during readhead and interface electrical connection.
1
Ensure suitable clamping to retain interboard connector on PCB.
Customer PCB
Ferrule
1
Cable interboard connector
ACi interface
2 mounting holes M3 through
Input
Output
www.renishaw.com
23