Starting the SCE 2000 Platform
You are now ready to start your SCE 2000 platform. Proceed to the section
and Observing Initial Conditions

Starting the System and Observing Initial Conditions

After installing your SCE 2000 platform and connecting cables, complete the following steps to
start the SCE 2000 platform:
Step 1
Make sure the power cables are connected to the SCE 2000 platform.
Step 2
Plug the AC power supply cables into the AC power source, or make sure the circuit breakers at
the DC panels are turned to the on position. Turn both power switches on (⏐).
Step 3
Listen for the fans; you should immediately hear them operating.
During the boot process, observe the following LEDs:
Step 4
It takes a several minutes for the SCE 2000 to boot and for the status LED to change from orange to
Note
flashing orange or flashing green.
Step 5
Observe the initialization process. When the system boot is complete, the console screen displays
a script and system banner similar to the following:
Cisco Internetwork Operating System Software
IOS (tm) 7300 Software (C7300-JS-M), Version 12.1(9), CISCO RELEASED VERSION
Copyright (c) 1986-2001 by Cisco Systems, Inc.
Compiled Tue 17-Jul-01 01:51 by biff
Image text-base:0x40008970, data-base:0x40BF8000
Step 6
When you start up the SCE 2000 platform for the first time, the system automatically enters the
setup wizard, which prompts you for configuration information for initial system configuration.
On the console terminal, after the system displays the system banner and hardware configuration,
you will see the System Configuration Dialog prompt. (Refer
page 5-3) for a complete description of the setup wizard.)
You have the option of proceeding with the setup wizard to configure the system, or exiting from
setup and using configuration commands to configure global (system-wide) and interface-specific
parameters. You do not have to configure the interfaces immediately.
If the system does not complete each of the steps in the startup procedure, proceed to Chapter 7,
Troubleshooting
Cisco SCE 2000 4xGBE Installation and Configuration Guide
7-2
Both Power LEDs should be green.
Bypass LED should be green while the SCE 2000 is on bypass and unlit when the bypass
is turned off.
The Status LED should be a constant orange while booting. After a successful boot, the
Status LED is flashing green.
(on page 8-1) for troubleshooting recommendations and procedures.
Chapter 7
(on page 7-2).
Basic SCE 2000 Platform Operations
Starting the System
to Initial System
Configuration (on
OL-7824-04