Replacing the Power Supply
Installing a DC-Input Power Supply
The DC-input power supply has two power connectors, as shown in
Figure 37
1
2
Follow these steps to install the DC-input power supply.
Insert the DC-input power supply, and then slide it to the front and side of the chassis. Please note that
Step 1
there are two hooks inside the front of the chassis that fit into openings on the side of the power supply.
When you slide the power supply to the front and then the side of the chassis, make sure that these hooks
engage corresponding openings on the side of the power supply.
Step 2
Install the power supply retention screw. See
Insert the air duct. Squeeze it gently at the bottom so that the four snaps on the duct are captured by the
Step 3
sheet metal retainers in the chassis. See
Step 4
Connect the primary power cable to the power supply. Make sure that the locking feature on the power
supply end snaps into position. See
Step 5
Connect the secondary power cable to the power supply and to the secondary power connector on the
motherboard. Make sure that the locking feature on the power supply end snaps into position. See
Figure
Installing and Upgrading Internal Modules in Cisco 2800 Series Routers
38
DC-Input Power Supply for the Cisco 2811 Router
3
2
Retention tab
Primary power connector
38.
1
3
Secondary power connector
Figure