HOIST AND COUNTERWEIGHT
CAUTION
Do not power the counterweight into the counterweight-
to-hoist mounting pins.
16. Slowly extend the counterweight removal cylinders (5)
(Figure 5-13) so the counterweight-to-hoist mounting
pins (12) (Figure 5-13) take the weight of the
counterweight (1) (Figure 5-13).
17. Connect the auxiliary hoist hydraulic lines and electrical
wires as tagged and disconnected earlier.
18. Remove the counterweight supports from the front of the
carrier.
5-26
Counterweight Stand Removal
1.
Attach an adequate lifting device with slings to a
counterweight stand (1) (Figure 5-12).
2.
Loosen jam nut (7) (Figure 5-12).
3.
Rotate foot plates (5) (Figure 5-12) on the counterweight
stand (1) (Figure 5-12) away from the outrigger box (2)
(Figure 5-12).
4.
Remove the counterweight stand (1) (Figure 5-12) to
carrier frame hitch pins (4) (Figure 5-12).
5.
Using the lifting device with slings, remove the
counterweight stand (1) (Figure 5-12).
Published 11-22-2016, Control # 345-12
RT9130E-2 SERVICE MANUAL
Need help?
Do you have a question about the Grove RT9130E-2 and is the answer not in the manual?