Preparation For Operation Start; Cleaning; Verification Of Insulation Resistance; Others - WEG AG10 Series Installation, Operation And Maintenance Manual

Synchronous alternators
Table of Contents

Advertisement

Available languages

Available languages

3.3.3.10 Preparation for operation start

3.3.3.10.1 Cleaning

The inside and outside of the alternator must be free of
oil, water, dust and dirt;
Remove the rust inhibitor of the exposed surfaces with
a cloth soaked in a petroleum-based solvent.
Make sure the bearings used for lubrication and
cavities are free from dirt and properly sealed.

3.3.3.10.2 Verification of insulation resistance

ATTENTION
Before putting the alternator into operation,
the insulation resistance of the windings
should be measured as in item 4.5 of this
manual.

3.3.3.10.3 Others

Follow all other procedures in the 5 item in this manual
before putting the alternator into operation.
12638144
Installation, operation and maintenance manual – Synchronous Alternator – AG10 line - Horizontal l 21
www.weg.net

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ag10 250Ag10 280Ag10 315Ag10 355Ag10 400

Table of Contents