Connecting Drain Hose; Pre Start-Up Checks - Jeio tech TC-ME-025 Operating Manual

Table of Contents

Advertisement

3.5 Connecting Drain hose

2 Condensate drains are installed on the rear side of the unit. These condensate drains are designed,
one for eliminating any water build up from the inside of chamber heats and cools, the other for escaping
water overflowed from the inside of chamber. To connect the condensate drain to a floor drain or any other
waste the outlet push soft-walled tubing, such as: vinyl, FKM, urethane, neoprene or silicone, over the drain
barb until is seated against the collar, then, tie it with a cable tie as shown below

3.6 Pre start-up checks

Make sure all unit and wall outlet electrical connections are tight.
Make sure condense drain hose is tightly on hose barb and hose is run to a drain.
Make sure caster feet are lowered and have locked the unit in place.
Make sure the unit is level side to side and front to back.
Make sure there are no flammable or explosive liquids inside of chamber

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tc-me-065Tc-me-100

Table of Contents